Conceptual aerial of an EVC-2500 Edge Vault Campus: nine precast concrete vaults inside one fenced acre beside a utility substation
EVC-2500 · Edge Vault® CampusEVN-575 · Edge Vault Node
Thermo Bond Solutions

Critical DutyBuildings

High compute critical buildings, manufactured in South Dakota and delivered ready to set. Months, not years.

Scroll
EVN-575 · Edge Vault Node

Look inside the vault.

ClickTap any glowing point to see the specs.

Scroll
Site and environmental impact

Water. Air. Noise. Land.

Critical infrastructure built to be a good neighbor.

0

Recurring water use.

A closed glycol-and-water loop, filled at commissioning.†

0

Cooling towers.

Air-cooled by design. Heat goes to air, not to a municipal system or an aquifer.

Quiet

Sound-packaged.

~As quiet as a commercial refrigerator. Chillers are packaged with sound insulation.†

1 acre

Fenced land.

A full EVC-2500. Plan 1.3–1.6 acres of parcel.

† Reference-design values. Water use and sound at the property line are confirmed for each project during site review.

The Edge Vault line

Start small. Grow on the same design.

Edge Vault Unit cutaway
01 · Start

EVU-200Edge Vault Unit

One precast concrete vault with power, cooling and fire protection built in. Best for edge, telecom and utility sites.

Buildings
1
IT load
200 kW
Racks
8 at 25 kW
Edge Vault Node
02 · Grow

EVN-575Edge Vault Node

Two buildings: one for servers, one for power. 575 kW for high-density GPU racks.

Buildings
2
IT load
575 kW
Cooling
Air-cooled at the rack
Edge Vault Campus: nine precast concrete vaults on one fenced acre
03 · Scale

EVC-2500Edge Vault Campus

Nine vaults on one fenced acre, 2.5 MW. Regional capacity that grows as you sign tenants.

Buildings
9
IT load
2.50 MW
Land
1 fenced acre
Line drawing: an EVU-200 Edge Vault Unit, 36 by 12 by 10 feet, shipped complete and set on its pad by crane with a spreader bar

Custom Solutions Builder

Your site. Our vaults.

Find your land on the map, tell us the IT load you need and lay out Edge Vaults to scale, with generators, chillers and drives. Save it and send it to us for a factory quote.

  1. 01Search your address or drop a pin.
  2. 02Enter your IT load and get a recommended mix.
  3. 03Drag and rotate to fit, then save and send.
Enter the builder
Construction, side by side

Traditional Data Center vs. Factory-Built Edge Vaults.

“Traditional compute facilities are built on site, one project at a time. Edge Vaults are designed once, cast and integrated in our plants, and delivered ready to set. Your schedule depends on site and power, not on starting a new building from scratch.”
Steven TimsPresident, Thermo Bond™ Solutions
Distributed EdgeOne 100 MW site, or 100 MW across forty one-acre TBS campuses

One large site puts every megawatt on one utility hookup, one community and one storm path. Distributed Edge places capacity across many smaller sites near power with room, so a single event touches a fraction of the network.

One 100 MW facility1 site
Sites
1
Utility hookups
1 large
Who carries the load
One community
One tornado path
100% of capacity at risk
100 MW across 40 TBS campuses40 sites
Sites
40 × one fenced acre
Utility hookups
40 smaller
Who carries the load
Shared across the grid
One tornado path
2 of 40 sites (5%)

Illustrative comparison. Site locations and tornado path are examples, not real projects or a forecast. Each EVC-2500 campus needs a 1.3–1.6 acre parcel for stormwater, staging and the utility easement. Actual siting depends on available utility capacity.

Why customers consider it

01

Use overlooked land

Parcels by substations, along rights-of-way and on hard-to-use ground.

02

Divide the capacity

Many small power draws spread across the grid, instead of one huge draw on a single substation.

03

Site where the grid has room

We build where power is already available, instead of waiting in line for a new utility connection.

04

Keep the benefits local

Lease income for landowners and new property tax base for counties.

Compare the lineupEVU-200 vs. EVN-575 vs. EVC-2500, side by side
CompareEVU-200EVN-575EVC-2500
Buildings129
IT load200 kW575 kW2.50 MW
CoolingIn-row, hot-aisle containment, chillerAir-cooled at the rackAir-cooled at the rack, sealed glycol loop
Standby powerGeneratorDedicated generatorsPer node, configured per site
Footprint36′ × 12′ vaultTwo 36′ × 12′ buildingsNine vaults on one fenced acre
Land requirement——1.00 fenced acre · 1.3–1.6 acre parcel
TimelineMonths, not yearsMonths, not yearsMonths, not years

Configurations shown are reference designs. Rack counts, rack density and IT platforms are specified per order. Lead times are factory scope, order to ship.

What we deliver, and what you bringScope of supply: Thermo Bond vs. customer or partner

Supply-only or turnkey, scoped per site. Site preparation, permitting and utility power can affect the delivery schedule.

Thermo Bond

  • Hardened precast concrete shelter, designed to ASCE Risk Category IV wind loads
  • Power, UPS and battery
  • Cooling and heat rejection
  • Clean-agent fire suppression
  • Controls, plus wiring ready for your security and monitoring
  • IT racks
  • Permitting and code compliance support, in-house
  • Freight and oversize-load delivery to site
  • Site prep when contracted: foundation, grounding, power rough-in, fiber pathway

Customer or partner

  • IT hardware: servers, storage, GPUs, network switches
  • Security solution and 24/7 monitoring
  • Internet and network service from your carrier
  • Utility power source and interconnection
  • Land and site acquisition
  • Installing and setting up servers and software
  • Ongoing operations and staffing
Why Edge Vaults

Fast, permanent, sized to fit.

Speed, permanence and fit are usually a trade-off. Edge Vaults are built to give you all three.

01

Faster, more predictable.

Built and tested in our plants while your site is prepared. Fewer trades on site, fewer surprises. Months, not years.

02

Hardened and permanent.

Precast concrete designed to ASCE Risk Category IV wind loads (200 mph),* with a 30+ year design life.

03

Fit to your site.

Standard configurations from one 200 kW vault to multi-acre campuses, placed where the power is.

04

Ready to grow.

Add capacity in phases as demand is signed, on the same proven design each time.

Who it's for

Start with your situation.

01

Telecom and utility

You already run the sites. Add computing power at towers, huts and substations you operate, built by the team that builds your shelters.

See the EVU-200
02

Neocloud and enterprise

You need capacity you control, fast. Dedicated, single-tenant campuses on your land, from one node to many acres.

See the EVC-2500
03

Landowners and power

You have land near a substation, or power with room to spare. Tell us where it is.

Submit a site
04

Channel partners

You have the customer and the opportunity. Bring it to us; we bring the building.

Become a partner
Start a project

Let's scope your project.

Tell us what you need protected or powered. A dedicated sales manager stays with you from first call through completion, and you get a detailed quote on our factory scope, freight included.